Phoenix Cleaning Company Call 07961 915018
LEV Testing in Aldridge

LEV Testing · Aldridge

LEV testing in Aldridge.

From the engineering units to the joinery and vehicle shops, Aldridge workplaces raise fume, mist and dust that the law says must be controlled - and the control proven by a thorough examination and test.

HSG258 examinationMeasured airflow readingsReport & labelFully insured

Where fume and dust control sits in Aldridge

In and around Aldridge the engineering and fabrication units weld and machine, the joinery and timber shops cut and sand, and the vehicle and refinishing shops grind and spray. Welding and grinding throw off weld fume and metal dust; the joinery and refinishing work adds wood dust, oil mist and paint mist - none of it fit for a worker to breathe.

Local exhaust ventilation catches it at source, and the law will not take that on trust. COSHH requires the weld-fume arms, the wood-dust extraction and the spray and mist extraction to be thoroughly examined and tested at least every 14 months, measured in use rather than assumed to work.

The Aldridge workplaces that need an LEV test

01

Precision engineering

CNC and manual machining raises oil mist and metal dust at the enclosure and bench that has to be captured at source.

02

Food and drink production

Flour, powders and steam need capture at the mixing and process points, from bakeries to production kitchens.

03

Woodworking and joinery

Saws, sanders and routers throw fine wood dust that has to be drawn off at the tool and the bench.

04

Welding and fabrication

Weld fume and grinding dust need capture at the arm and booth, wherever steel is fabricated.

05

Vehicle body and paint

Bodyshop spray booths and prep bays carry paint mist and solvent vapour that the extraction has to hold and clear.

06

Laboratory and clinical

Fume cupboards, safety cabinets and dental and salon extraction all count as LEV and all fall due on the same clock.

Typical LEV tests around Aldridge

Typical jobs we handle, by sector and area - representative of the work we do, not named clients.

Fabrication unit - Aldridge

A weld-fume and grinding-dust test

At a fabrication unit on an Aldridge industrial estate, welding, grinding and fabricating, the LEV was no longer clearing the weld fume and metal dust and a haze built up over the shift. We gauged capture and transport velocities, examined the ducting, and found a collapsed flexible choking the run. We listed the remedials, and re-tested to prove the control once put right, then certified to HSG258.

Vehicle bodyshop - Aldridge

A spray-mist extraction test

At a vehicle bodyshop in Aldridge, spraying and finishing, the system was failing to catch the paint mist and solvent at source. We measured at each hood and along the duct, and found clogged filters and a slipping fan belt cutting the draw. We specified the remedial action and, once done, re-tested and certified the control to HSG258.

What a thorough examination and test measures in Aldridge

01

Visual and structural

Condition of hoods, ducting, filters and fan - the damage, blockage and wear that quietly drops performance.

02

Quantitative performance

Measured capture and face velocities at the working points, plus transport velocity and static pressure through the system.

03

Benchmark to design

The readings assessed against how the LEV should perform to actually control the exposure - not just whether the fan turns.

04

Air sampling, where needed

Where the process warrants it, sampling to confirm the control is keeping the substance out of the breathing zone.

LEV TESTINGAldridge

Fourteen months, and whose name is on it

A thorough examination and test under COSHH is a real assessment, not a rubber stamp. It is a structured examination of the system's condition, measurement of its actual performance, and an assessment of those readings against how the system should perform to control the exposure. It follows the HSE's guidance, HSG258, and ends in a report and a label.

We test to the HSE's guidance, HSG258, and the job ends in a report and a label on the plant: what was measured, what passed, what needs putting right, and the date the next test falls due.

  • Visual and structural examination of hoods, ducting, filter and fan
  • Measured airflow, capture and face velocities at the working points
  • Static pressure and duct transport velocity readings recorded
  • Report against the benchmark, with a label and the next-due date

Examine, measure, report, label

1

Inspect

We examine the condition of the hoods, ducting, filter and fan and how each is meant to control its process.

2

Test

We measure capture and face velocities, transport velocity and static pressure at every key point.

3

Assess

The readings are judged against the design benchmark under HSG258, with a clear pass or fail on control.

4

Certify

The plant is labelled and you get the report and next-due date for your COSHH records.

Frequently asked questions

How often does LEV have to be tested?

COSHH Regulation 9 sets a maximum of 14 months between tests, and some higher-risk processes need it sooner. We set the interval to match what you run and record the next-due date on the label and the report.

What do we get at the end?

A report of the thorough examination and test to HSG258, each point marked pass or fail with any remedial work set out, and a dated label on the plant with the next-due date.

What if a point fails?

We set out exactly what failed and why - often a single reading such as static pressure or capture velocity - so it can be put right, and we re-test to confirm the control before certifying.

Do you cover Aldridge and the wider area?

Yes - the Aldridge workshops and units, and across Aldridge and the wider West Midlands.

Do you only test engineering extraction?

No - any LEV: welding fume arms, wood and grain dust systems, spray booths, mist extraction, fume cupboards, and dental and salon extraction all fall under the same duty and the same clock.

LEV testing in Aldridge

In and around Aldridge

Welding, grinding, sawing, sanding and spraying go on across Aldridge, and each throws off something a worker should not breathe - weld fume, metal and wood dust, oil mist and paint mist. The duty is to control it at source and prove the control with a measured test.

20+ years of experience

We have carried out LEV thorough examination and testing to HSG258 since 2001, across West Midlands and the UK. From a machine shop to a joinery, a spray booth or a lab fume cupboard, the job ends the same way: measured readings, a clear verdict, and a label whose next-due date you can rely on.

Book your Aldridge LEV thorough examination

Tell us what you run and we will examine, measure, report and label it to HSG258 - across West Midlands.