Phoenix Cleaning Company Call 07961 915018
LEV Testing in Clay Cross

LEV Testing · Clay Cross

LEV testing in Clay Cross.

Across Clay Cross, the engineering, joinery and vehicle workshops throw off fume, mist and dust the law requires to be controlled - and the control proven by a thorough examination and test.

HSG258 examinationMeasured airflow readingsReport & labelFully insured

Where fume and dust control sits in Clay Cross

The workshops of Clay Cross are where the engineering and fabrication units weld and machine, the joinery and timber shops cut and sand, and the vehicle and refinishing shops grind and spray. The arc and the grinder raise weld fume and metal dust, and the joinery and spray work add wood dust, oil mist and paint mist, all of which a worker should be kept from breathing.

Local exhaust ventilation catches it at source, and the law will not take that on trust. COSHH requires the weld-fume arms, the wood-dust extraction and the spray and mist extraction to be thoroughly examined and tested at least every 14 months, measured in use rather than assumed to work.

The Clay Cross workplaces that need an LEV test

01

Precision engineering

CNC and manual machining raises oil mist and metal dust at the enclosure and bench that has to be captured at source.

02

Food and drink production

Flour, powders and steam need capture at the mixing and process points, from bakeries to production kitchens.

03

Woodworking and joinery

Saws, sanders and routers throw fine wood dust that has to be drawn off at the tool and the bench.

04

Welding and fabrication

Weld fume and grinding dust need capture at the arm and booth, wherever steel is fabricated.

05

Vehicle body and paint

Bodyshop spray booths and prep bays carry paint mist and solvent vapour that the extraction has to hold and clear.

06

Laboratory and clinical

Fume cupboards, safety cabinets and dental and salon extraction all count as LEV and all fall due on the same clock.

Typical LEV tests around Clay Cross

Typical jobs we handle, by sector and area - representative of the work we do, not named clients.

Fabrication unit - Clay Cross

A weld-fume and grinding-dust test

At a fabrication unit near Clay Cross, welding, grinding and fabricating, the arms and hoods were barely pulling and weld fume and metal dust drifted into the workspace. We tested capture at each point, checked the dampers and filters, and found a damper stuck and the filters loaded. We reported what needed putting right and re-tested to confirm it held spec, certifying to HSG258.

Vehicle bodyshop - Clay Cross

A spray-mist extraction test

At a vehicle bodyshop near Clay Cross, spraying and finishing, the arms and hoods were barely pulling and paint mist and solvent drifted into the workspace. We checked capture at the hoods, the ducting and the filters, and found the fan and filters below the duty the process needed. We set out the fix, re-tested to confirm capture was back to spec, and certified to HSG258 with a dated label.

What a thorough examination and test measures in Clay Cross

01

Visual and structural

Condition of hoods, ducting, filters and fan - the damage, blockage and wear that quietly drops performance.

02

Quantitative performance

Measured capture and face velocities at the working points, plus transport velocity and static pressure through the system.

03

Benchmark to design

The readings assessed against how the LEV should perform to actually control the exposure - not just whether the fan turns.

04

Air sampling, where needed

Where the process warrants it, sampling to confirm the control is keeping the substance out of the breathing zone.

LEV TESTINGClay Cross

Fourteen months, and whose name is on it

The point of a thorough examination and test is to prove the extraction still controls the exposure - so we measure it, we do not eyeball it. Condition, capture and face velocities, transport velocity and static pressure are checked against the design intent under HSG258, and the result is written up and labelled on the plant.

We test to the HSE's guidance, HSG258, and the job ends in a report and a label on the plant: what was measured, what passed, what needs putting right, and the date the next test falls due.

  • The system examined end to end - hood to discharge
  • Capture and face velocities measured at source
  • Transport velocity and static pressure recorded
  • A report, a verdict and a label with the next-due date

Examine, measure, report, label

1

Inspect

We examine the hoods, ducting, filter and fan and identify how each is meant to control its process.

2

Take readings

We record capture and face velocities, transport velocity and static pressure at every key point.

3

Judge

The readings are assessed against the design intent under HSG258, with a clear verdict on control.

4

Label up

The plant is labelled with the result and next-due date, and you get the report for the COSHH file.

Frequently asked questions

How often does LEV have to be tested?

At least every 14 months under COSHH Regulation 9 - and sooner for certain higher-risk processes. We set the right interval for what you run and put the next-due date on the label and the report.

What do we get at the end?

An HSG258 thorough-examination-and-test report, a clear pass or fail at every point with remedials listed, and a dated plant label carrying the next test date.

What if a point fails?

We set out exactly what failed and why - often a single reading such as static pressure or capture velocity - so it can be put right, and we re-test to confirm the control before certifying.

Do you cover Clay Cross and the wider area?

Yes - the Clay Cross workshops and units, and across Clay Cross and the wider Derbyshire.

Do you only test engineering extraction?

No - any LEV: welding fume arms, wood and grain dust systems, spray booths, mist extraction, fume cupboards, and dental and salon extraction all fall under the same duty and the same clock.

LEV testing in Clay Cross

In and around Clay Cross

Welding, grinding, sawing, sanding and spraying go on across Clay Cross, and each throws off something a worker should not breathe - weld fume, metal and wood dust, oil mist and paint mist. The duty is to control it at source and prove the control with a measured test.

20+ years of experience

We have carried out LEV thorough examination and testing to HSG258 since 2001, across Derbyshire and the UK. From a machine shop to a joinery, a spray booth or a lab fume cupboard, the job ends the same way: measured readings, a clear verdict, and a label whose next-due date you can rely on.

Book your Clay Cross LEV thorough examination

Tell us what you run and we will examine, measure, report and label it to HSG258 - across Derbyshire.