Phoenix Cleaning Company Call 07961 915018
LEV Testing in Hazel Grove

LEV Testing · Hazel Grove

LEV testing in Hazel Grove.

The engineering, electronics and vehicle units around Hazel Grove and Bramhall Moor Lane weld, machine, solder and finish, raising fume, mist and dust the law says must be controlled. We examine and test local exhaust ventilation to HSG258 and certify it.

HSG258 examinationMeasured airflow readingsReport & labelFully insured

Where fume and dust control sits in Hazel Grove

Hazel Grove keeps a real technical trade off Bramhall Moor Lane, where a long-standing semiconductor plant sits among engineering, electronics and vehicle units on the Stockport edge. Their welding and grinding bays, soldering and assembly benches, spray booths and machining lines all raise something their local exhaust ventilation has to capture at source.

LEV works hard and quietly loses its edge - filters load, ducts fur, a fan tires - until a hood stops holding the exposure. We carry out thorough examination and testing to HSG258 across Hazel Grove: measured capture and face velocities at the working points, a judgement against how the system was meant to perform, and a label carrying a next-due date you can trust.

The Hazel Grove workplaces that need an LEV test

01

Precision engineering

CNC and manual machining raises oil mist and metal dust at the enclosure and bench that has to be captured at source.

02

Food and drink production

Flour, powders and steam need capture at the mixing and process points, from bakeries to production kitchens.

03

Woodworking and joinery

Saws, sanders and routers throw fine wood dust that has to be drawn off at the tool and the bench.

04

Welding and fabrication

Weld fume and grinding dust need capture at the arm and booth, wherever steel is fabricated.

05

Vehicle body and paint

Bodyshop spray booths and prep bays carry paint mist and solvent vapour that the extraction has to hold and clear.

06

Laboratory and clinical

Fume cupboards, safety cabinets and dental and salon extraction all count as LEV and all fall due on the same clock.

What we have tested around Hazel Grove

Real jobs, described by sector and area - never by a client's name.

Electronics unit · Bramhall Moor Lane

A solder-fume LEV test

At a Bramhall Moor Lane electronics unit the solder-fume extraction needed examining. We measured capture at each bench and the transport velocity through the ducting, found one branch starved, set the fix, and re-tested before certifying.

Engineering unit · Hazel Grove

A weld-fume and mist test

A Hazel Grove engineering unit needed its weld-fume and machining-mist extraction testing. We measured capture at each arm and bench and the transport velocity, and labelled the plant with the readings and next-due date.

What a thorough examination and test measures in Hazel Grove

01

Visual and structural

Condition of hoods, ducting, filters and fan - the damage, blockage and wear that quietly drops performance.

02

Quantitative performance

Measured capture and face velocities at the working points, plus transport velocity and static pressure through the system.

03

Benchmark to design

The readings assessed against how the LEV should perform to actually control the exposure - not just whether the fan turns.

04

Air sampling, where needed

Where the process warrants it, sampling to confirm the control is keeping the substance out of the breathing zone.

LEV TESTINGHazel Grove

Fourteen months, and whose name is on it

A thorough examination and test under COSHH is a real assessment, not a rubber stamp. It is a structured examination of the system's condition, measurement of its actual performance, and an assessment of those readings against how the system should perform to control the exposure. It follows the HSE's guidance, HSG258, and ends in a report and a label.

We test to the HSE's guidance, HSG258, and the job ends in a report and a label on the plant: what was measured, what passed, what needs putting right, and the date the next test falls due.

  • Visual and structural examination of hoods, ducting, filter and fan
  • Measured airflow, capture and face velocities at the working points
  • Static pressure and duct transport velocity readings recorded
  • Report against the benchmark, with a label and the next-due date

Examine, measure, report, label

1

Inspect

We examine the condition of the hoods, ducting, filter and fan and how each is meant to control its process.

2

Test

We measure capture and face velocities, transport velocity and static pressure at every key point.

3

Assess

The readings are judged against the design benchmark under HSG258, with a clear pass or fail on control.

4

Certify

The plant is labelled and you get the report and next-due date for your COSHH records.

Frequently asked questions

How often does LEV need testing?

At least every 14 months for most systems, sooner for higher-risk work such as heavy welding. We match the interval to the process and label the next-due date on the plant.

What does the test measure?

The condition of hoods, ducts, filters and fan, and measured capture, face, transport and static-pressure readings - all weighed against how the LEV should perform to control the exposure.

What if a point fails?

We set out what failed and why, usually a single reading, so it can be corrected, then re-test to confirm control before certifying.

Do you cover the Hazel Grove units?

Yes - the engineering, electronics and vehicle units around the town and Bramhall Moor Lane, and the wider Greater Manchester.

Do you only test welding extraction?

No - weld fume, solder fume, machining mist, paint spray, metal and wood dust, fume cupboards and salon and dental extraction all fall under the same duty.

LEV testing in Hazel Grove

In and around Hazel Grove

The Hazel Grove units carry the area's welding, soldering, machining and vehicle trades, the fume, mist and dust drawn off wherever it is raised. We test to HSG258 so those lines can prove their extraction holds what their people would otherwise breathe.

20+ years of experience

We have carried out LEV thorough examination and testing to HSG258 since 2001, across Greater Manchester and the UK. From a machine shop to a joinery, a spray booth or a lab fume cupboard, the job ends the same way: measured readings, a clear verdict, and a label whose next-due date you can rely on.

Book your Hazel Grove LEV thorough examination

Tell us what you run and we will examine, measure, report and label it to HSG258 - across Greater Manchester.