Phoenix Cleaning Company Call 07961 915018
LEV Testing in Milnrow

LEV Testing · Milnrow

LEV testing in Milnrow.

Across Milnrow, the engineering, joinery and vehicle workshops throw off fume, mist and dust the law requires to be controlled - and the control proven by a thorough examination and test.

HSG258 examinationMeasured airflow readingsReport & labelFully insured

Where fume and dust control sits in Milnrow

In and around Milnrow the engineering and distribution units weld, machine and fabricate, the joinery and timber shops cut and sand, and the vehicle and depot workshops grind and refinish. Welding and grinding throw off weld fume and metal dust; the joinery and refinishing work adds wood dust, oil mist and paint mist - none of it fit for a worker to breathe.

It is local exhaust ventilation that captures the fume and dust at source - and the control has to be proven, not assumed. Under COSHH the weld-fume arms, wood-dust extraction and spray and mist extraction must be thoroughly examined and tested at least every 14 months, measured against how they are actually run.

The Milnrow workplaces that need an LEV test

01

Precision engineering

CNC and manual machining raises oil mist and metal dust at the enclosure and bench that has to be captured at source.

02

Food and drink production

Flour, powders and steam need capture at the mixing and process points, from bakeries to production kitchens.

03

Woodworking and joinery

Saws, sanders and routers throw fine wood dust that has to be drawn off at the tool and the bench.

04

Welding and fabrication

Weld fume and grinding dust need capture at the arm and booth, wherever steel is fabricated.

05

Vehicle body and paint

Bodyshop spray booths and prep bays carry paint mist and solvent vapour that the extraction has to hold and clear.

06

Laboratory and clinical

Fume cupboards, safety cabinets and dental and salon extraction all count as LEV and all fall due on the same clock.

Typical LEV tests around Milnrow

Typical jobs we handle, by sector and area - representative of the work we do, not named clients.

Engineering unit - Kingsway Business Park

A weld-fume and grinding-dust test

At an engineering unit on the Kingsway Business Park near Milnrow, welding, grinding and fabricating, the system was failing to catch the weld fume and metal dust at source. We measured face velocities and static pressure, checked the run, and found undersized ducting and a worn fan. We specified the remedial action and, once done, re-tested and certified the control to HSG258.

Distribution-depot workshop - Kingsway

A spray-mist extraction test

At a distribution-depot workshop on the Kingsway Business Park near Milnrow, spraying and finishing, the arms and hoods were barely pulling and paint mist and solvent drifted into the workspace. We measured at each hood and along the duct, and found clogged filters and a slipping fan belt cutting the draw. We set out the remedial work and re-tested to confirm control before certifying to HSG258.

What a thorough examination and test measures in Milnrow

01

Visual and structural

Condition of hoods, ducting, filters and fan - the damage, blockage and wear that quietly drops performance.

02

Quantitative performance

Measured capture and face velocities at the working points, plus transport velocity and static pressure through the system.

03

Benchmark to design

The readings assessed against how the LEV should perform to actually control the exposure - not just whether the fan turns.

04

Air sampling, where needed

Where the process warrants it, sampling to confirm the control is keeping the substance out of the breathing zone.

LEV TESTINGMilnrow

Fourteen months, and whose name is on it

The point of a thorough examination and test is to prove the extraction still controls the exposure - so we measure it, we do not eyeball it. Condition, capture and face velocities, transport velocity and static pressure are checked against the design intent under HSG258, and the result is written up and labelled on the plant.

We test to the HSE's guidance, HSG258, and the job ends in a report and a label on the plant: what was measured, what passed, what needs putting right, and the date the next test falls due.

  • The system examined end to end - hood to discharge
  • Capture and face velocities measured at source
  • Transport velocity and static pressure recorded
  • A report, a verdict and a label with the next-due date

Examine, measure, report, label

1

Inspect

We examine the hoods, ducting, filter and fan and identify how each is meant to control its process.

2

Take readings

We record capture and face velocities, transport velocity and static pressure at every key point.

3

Judge

The readings are assessed against the design intent under HSG258, with a clear verdict on control.

4

Label up

The plant is labelled with the result and next-due date, and you get the report for the COSHH file.

Frequently asked questions

How often does LEV have to be tested?

No more than every 14 months under COSHH Regulation 9, and sooner for certain higher-risk work. We judge the right interval for your process and put the next-due date on both the plant label and the report.

What do we get at the end?

An HSG258 thorough-examination-and-test report, a clear pass or fail at every point with remedials listed, and a dated plant label carrying the next test date.

What if a point fails?

We set out exactly what failed and why - often a single reading such as static pressure or capture velocity - so it can be put right, and we re-test to confirm the control before certifying.

Do you cover Milnrow and the wider area?

Yes - the Milnrow workshops and units, and across Milnrow and the wider Greater Manchester.

Do you only test engineering extraction?

No - any LEV: welding fume arms, wood and grain dust systems, spray booths, mist extraction, fume cupboards, and dental and salon extraction all fall under the same duty and the same clock.

LEV testing in Milnrow

In and around Milnrow

Welding, grinding, sawing, sanding and spraying go on across Milnrow, and each throws off something a worker should not breathe - weld fume, metal and wood dust, oil mist and paint mist. The duty is to control it at source and prove the control with a measured test.

20+ years of experience

We have carried out LEV thorough examination and testing to HSG258 since 2001, across Greater Manchester and the UK. From a machine shop to a joinery, a spray booth or a lab fume cupboard, the job ends the same way: measured readings, a clear verdict, and a label whose next-due date you can rely on.

Book your Milnrow LEV thorough examination

Tell us what you run and we will examine, measure, report and label it to HSG258 - across Greater Manchester.