LEV Testing · Milton Keynes
From the textile-finishing plants to the engineering, joinery and distribution units about the city, Milton Keynes workplaces raise fume, mist and dust that the law says must be controlled - and the control proven by a thorough examination and test.
Milton Keynes was built for making and moving things as much as living, and it works for a living across the grid. Its industry gathers on the trade estates and the great distribution parks about the city, where textile-finishing, engineering and food units sit alongside the joineries and finishing trades that serve the region. Every one of them raises something a worker should not breathe - textile fibre and finishing dust, solvent vapour, weld fume, oil mist or wood dust.
Local exhaust ventilation is what captures it at source, and the law does not take the control on trust. Under COSHH the extraction has to be thoroughly examined and tested at least every 14 months, measured against how it is used - not just switched on and assumed to work.
CNC and manual machining raises oil mist and metal dust at the enclosure and bench that has to be captured at source.
Flour, powders and steam need capture at the mixing and process points, from bakeries to production kitchens.
Saws, sanders and routers throw fine wood dust that has to be drawn off at the tool and the bench.
Weld fume and grinding dust need capture at the arm and booth, wherever steel is fabricated.
Bodyshop spray booths and prep bays carry paint mist and solvent vapour that the extraction has to hold and clear.
Fume cupboards, safety cabinets and dental and salon extraction all count as LEV and all fall due on the same clock.
Real jobs, described by sector and area - never by a client's name.
At a textile finishing plant in Milton Keynes, the extraction over the finishing lines and the coating station had lost draw, fibre dust and solvent vapour reaching the operators. We measured capture at each line and hood, checked the ducting and filtration, and found a fan below duty and a choked take-off. We set out the remedial action, and re-tested to confirm the control before certifying.
At a Milton Keynes joinery the dust extraction served several machines off one system, and the run to the furthest machine had lost transport velocity. We measured at each hood, checked the ducting and the discharge, and reported exactly which take-off fell short and why - so it could be put right and re-tested rather than left to silt up.
Condition of hoods, ducting, filters and fan - the damage, blockage and wear that quietly drops performance.
Measured capture and face velocities at the working points, plus transport velocity and static pressure through the system.
The readings assessed against how the LEV should perform to actually control the exposure - not just whether the fan turns.
Where the process warrants it, sampling to confirm the control is keeping the substance out of the breathing zone.

The point of a thorough examination and test is to prove the extraction still controls the exposure - so we measure it, we do not eyeball it. Condition, capture and face velocities, transport velocity and static pressure are checked against the design intent under HSG258, and the result is written up and labelled on the plant.
We test to the HSE's guidance, HSG258, and the job ends in a report and a label on the plant: what was measured, what passed, what needs putting right, and the date the next test falls due.
We inspect the system's condition - hoods, ducting, filter and fan - and identify how it is meant to control each process.
We take the readings: capture and face velocities, duct transport velocity and static pressure at the key points.
We assess the readings against the benchmark and set out clearly whether the system is controlling the exposure.
The system is labelled with the test result and next-due date, and you get the report for your COSHH file.
At least every 14 months under COSHH Regulation 9 - and sooner for certain higher-risk processes. We set the right interval for what you run and put the next-due date on the label and the report.
A thorough-examination-and-test report against HSG258, a pass/fail on each point with any remedials listed, and a dated label on the plant showing when the next test falls due.
We set out exactly what failed and why - often a single reading such as static pressure or capture velocity - so it can be put right, and we re-test to confirm the control before certifying.
Yes - the distribution and trade estates and the city's units, and across Milton Keynes and the wider Buckinghamshire.
No - any LEV: welding fume arms, wood and grain dust systems, spray booths, mist extraction, fume cupboards, and dental and salon extraction all fall under the same duty and the same clock.

Bletchley Park proved, in secret, that careful, measured work could crack the impossible - and the new city that grew around it built its economy on precise making and moving. That instinct runs through the city's textile, engineering and finishing works, and every one carries a duty to control the dust, fume and mist its work throws off - and to prove it with a measured test.
We have carried out LEV thorough examination and testing to HSG258 since 2001, across Buckinghamshire and the UK. From a machine shop to a joinery, a spray booth or a lab fume cupboard, the job ends the same way: measured readings, a clear verdict, and a label whose next-due date you can rely on.
Tell us what you run and we will examine, measure, report and label it to HSG258 - across Buckinghamshire.