Phoenix Cleaning Company Call 07961 915018
LEV Testing in Pembroke Dock

LEV Testing · Pembroke Dock

LEV testing in Pembroke Dock.

From the engineering units to the joinery and vehicle shops, Pembroke Dock workplaces raise fume, mist and dust that the law says must be controlled - and the control proven by a thorough examination and test.

HSG258 examinationMeasured airflow readingsReport & labelFully insured

Where fume and dust control sits in Pembroke Dock

The workshops of Pembroke Dock are where the marine and fabrication units weld and machine, the boatyards and joinery shops cut and sand, and the vehicle and refinishing shops grind and spray. The arc and the grinder raise weld fume and metal dust, and the joinery and spray work add wood dust, oil mist and paint mist, all of which a worker should be kept from breathing.

Local exhaust ventilation is what captures it at source, and the law does not take the control on trust. Under COSHH the weld-fume arms, the wood-dust extraction and the spray and mist extraction have to be thoroughly examined and tested at least every 14 months, measured against how they are used, not just switched on and assumed to work.

The Pembroke Dock workplaces that need an LEV test

01

Precision engineering

CNC and manual machining raises oil mist and metal dust at the enclosure and bench that has to be captured at source.

02

Food and drink production

Flour, powders and steam need capture at the mixing and process points, from bakeries to production kitchens.

03

Woodworking and joinery

Saws, sanders and routers throw fine wood dust that has to be drawn off at the tool and the bench.

04

Welding and fabrication

Weld fume and grinding dust need capture at the arm and booth, wherever steel is fabricated.

05

Vehicle body and paint

Bodyshop spray booths and prep bays carry paint mist and solvent vapour that the extraction has to hold and clear.

06

Laboratory and clinical

Fume cupboards, safety cabinets and dental and salon extraction all count as LEV and all fall due on the same clock.

Typical LEV tests around Pembroke Dock

Typical jobs we handle, by sector and area - representative of the work we do, not named clients.

Marine-engineering unit - Pembroke Dock

A weld-fume and grinding-dust test

At a marine-engineering unit on the waterfront at Pembroke Dock, welding, grinding and fabricating, capture had slipped below what the process needed and weld fume and metal dust was carrying across the floor. We measured capture and face velocities at each point, checked the ducting and filters, and traced it to a fan running below duty. We set out what to put right, re-tested after the work, and certified the system to HSG258.

Boatyard workshop - Pembroke Dock

A wood-dust and spray-mist test

At a boatyard workshop in Pembroke Dock, running the saws, planers and sander, the LEV was no longer clearing the wood dust and a haze built up over the shift. We tested capture at each point, checked the dampers and filters, and found a damper stuck and the filters loaded. We set out what to put right, re-tested after the work, and certified the system to HSG258.

What a thorough examination and test measures in Pembroke Dock

01

Visual and structural

Condition of hoods, ducting, filters and fan - the damage, blockage and wear that quietly drops performance.

02

Quantitative performance

Measured capture and face velocities at the working points, plus transport velocity and static pressure through the system.

03

Benchmark to design

The readings assessed against how the LEV should perform to actually control the exposure - not just whether the fan turns.

04

Air sampling, where needed

Where the process warrants it, sampling to confirm the control is keeping the substance out of the breathing zone.

LEV TESTINGPembroke Dock

Fourteen months, and whose name is on it

The point of a thorough examination and test is to prove the extraction still controls the exposure - so we measure it, we do not eyeball it. Condition, capture and face velocities, transport velocity and static pressure are checked against the design intent under HSG258, and the result is written up and labelled on the plant.

We test to the HSE's guidance, HSG258, and the job ends in a report and a label on the plant: what was measured, what passed, what needs putting right, and the date the next test falls due.

  • The system examined end to end - hood to discharge
  • Capture and face velocities measured at source
  • Transport velocity and static pressure recorded
  • A report, a verdict and a label with the next-due date

Examine, measure, report, label

1

Inspect

We examine the condition of the hoods, ducting, filter and fan and how each is meant to control its process.

2

Test

We measure capture and face velocities, transport velocity and static pressure at every key point.

3

Assess

The readings are judged against the design benchmark under HSG258, with a clear pass or fail on control.

4

Certify

The plant is labelled and you get the report and next-due date for your COSHH records.

Frequently asked questions

How often does LEV have to be tested?

At least every 14 months under COSHH Regulation 9 - and sooner for certain higher-risk processes. We set the right interval for what you run and put the next-due date on the label and the report.

What do we get at the end?

A thorough-examination-and-test report against HSG258, a pass/fail on each point with any remedials listed, and a dated label on the plant showing when the next test falls due.

What if a point fails?

We set out exactly what failed and why - often a single reading such as static pressure or capture velocity - so it can be put right, and we re-test to confirm the control before certifying.

Do you cover Pembroke Dock and the wider area?

Yes - the Pembroke Dock workshops and units, and across Pembroke Dock and the wider Pembrokeshire.

Do you only test engineering extraction?

No - any LEV: welding fume arms, wood and grain dust systems, spray booths, mist extraction, fume cupboards, and dental and salon extraction all fall under the same duty and the same clock.

LEV testing in Pembroke Dock

In and around Pembroke Dock

Welding, grinding, sawing, sanding and spraying go on across Pembroke Dock, and each throws off something a worker should not breathe - weld fume, metal and wood dust, oil mist and paint mist. The duty is to control it at source and prove the control with a measured test.

20+ years of experience

We have carried out LEV thorough examination and testing to HSG258 since 2001, across South Wales and the UK. From a machine shop to a joinery, a spray booth or a lab fume cupboard, the job ends the same way: measured readings, a clear verdict, and a label whose next-due date you can rely on.

Book your Pembroke Dock LEV thorough examination

Tell us what you run and we will examine, measure, report and label it to HSG258 - across South Wales.