Phoenix Cleaning Company Call 07961 915018
LEV Testing in Skipton

LEV Testing · Skipton

LEV testing in Skipton.

From the label-printing works to the engineering and finishing units, Skipton workplaces raise fume, mist and dust that the law says must be controlled - and the control proven by a thorough examination and test.

HSG258 examinationMeasured airflow readingsReport & labelFully insured

Where fume and dust control sits in Skipton

Skipton's Broughton Road estate carries a print trade, and a label works among it runs self-adhesive labels through flexo and UV presses and die-cuts the matrix away. Where a works prints in flexo and UV ink and strips the matrix backing the vapour and dust are real - the ink and UV cure give off a vapour and the die-cut matrix and backing throw off a dust - and the estate's engineering and finishing units add weld fume, oil mist and grinding dust, all things a worker should not breathe.

Local exhaust ventilation is what captures it at source, and the law does not take the control on trust. Under COSHH the press-vapour extraction, the die-cut dust capture and the engineering extraction have to be thoroughly examined and tested at least every 14 months, measured against how they are used, not just switched on and assumed to work.

The Skipton workplaces that need an LEV test

01

Precision engineering

CNC and manual machining raises oil mist and metal dust at the enclosure and bench that has to be captured at source.

02

Food and drink production

Flour, powders and steam need capture at the mixing and process points, from bakeries to production kitchens.

03

Woodworking and joinery

Saws, sanders and routers throw fine wood dust that has to be drawn off at the tool and the bench.

04

Welding and fabrication

Weld fume and grinding dust need capture at the arm and booth, wherever steel is fabricated.

05

Vehicle body and paint

Bodyshop spray booths and prep bays carry paint mist and solvent vapour that the extraction has to hold and clear.

06

Laboratory and clinical

Fume cupboards, safety cabinets and dental and salon extraction all count as LEV and all fall due on the same clock.

What we have tested around Skipton

Real jobs, described by sector and area - never by a client's name.

Label-printing works · Skipton area

A press-vapour and matrix-dust test

At a label works on the Broughton Road estate near Skipton, printing in flexo and UV and die-cutting the matrix, the extraction over the press decks and the die-cut station had lost capture and ink vapour and matrix dust were carrying across the floor. We measured capture at the press decks and the die-cut, checked the ducting and the filter, and found a fan below duty dragging the run. We set out the remedial action, and re-tested to confirm the control before certifying.

Engineering unit · Skipton area

A weld-fume and mist extraction test

At an engineering unit on the Broughton Road estate near Skipton, the weld-fume arms and mist extraction over the machining had lost capture and the shop was hazing by mid-shift. We measured capture and face velocities at each point, checked the ducting and the filters, and reported what needed putting right so it held its spec on a re-test.

What a thorough examination and test measures in Skipton

01

Visual and structural

Condition of hoods, ducting, filters and fan - the damage, blockage and wear that quietly drops performance.

02

Quantitative performance

Measured capture and face velocities at the working points, plus transport velocity and static pressure through the system.

03

Benchmark to design

The readings assessed against how the LEV should perform to actually control the exposure - not just whether the fan turns.

04

Air sampling, where needed

Where the process warrants it, sampling to confirm the control is keeping the substance out of the breathing zone.

LEV TESTINGSkipton

Fourteen months, and whose name is on it

The point of a thorough examination and test is to prove the extraction still controls the exposure - so we measure it, we do not eyeball it. Condition, capture and face velocities, transport velocity and static pressure are checked against the design intent under HSG258, and the result is written up and labelled on the plant.

We test to the HSE's guidance, HSG258, and the job ends in a report and a label on the plant: what was measured, what passed, what needs putting right, and the date the next test falls due.

  • The system examined end to end - hood to discharge
  • Capture and face velocities measured at source
  • Transport velocity and static pressure recorded
  • A report, a verdict and a label with the next-due date

Examine, measure, report, label

1

Inspect

We examine the condition of the hoods, ducting, filter and fan and how each is meant to control its process.

2

Test

We measure capture and face velocities, transport velocity and static pressure at every key point.

3

Assess

The readings are judged against the design benchmark under HSG258, with a clear pass or fail on control.

4

Certify

The plant is labelled and you get the report and next-due date for your COSHH records.

Frequently asked questions

How often does LEV have to be tested?

At least every 14 months under COSHH Regulation 9 - and sooner for certain higher-risk processes. We set the right interval for what you run and put the next-due date on the label and the report.

What do we get at the end?

A thorough-examination-and-test report against HSG258, a pass/fail on each point with any remedials listed, and a dated label on the plant showing when the next test falls due.

What if a point fails?

We set out exactly what failed and why - often a single reading such as static pressure or capture velocity - so it can be put right, and we re-test to confirm the control before certifying.

Do you cover the the Broughton Road industrial estate and the wider town?

Yes - the the Broughton Road industrial estate and the town's units, and across Skipton and the wider North Yorkshire.

Do you only test engineering extraction?

No - any LEV: welding fume arms, wood and grain dust systems, spray booths, mist extraction, fume cupboards, and dental and salon extraction all fall under the same duty and the same clock.

LEV testing in Skipton

In and around Skipton

Skipton keeps a label-printing trade and a run of engineering units on the Broughton Road estate, printing in flexo and UV, die-cutting, welding and machining - raising ink vapour, matrix dust, weld fume and oil mist. Every one carries a duty to control what its work throws off - and to prove it with a measured test.

20+ years of experience

We have carried out LEV thorough examination and testing to HSG258 since 2001, across North Yorkshire and the UK. From a machine shop to a joinery, a spray booth or a lab fume cupboard, the job ends the same way: measured readings, a clear verdict, and a label whose next-due date you can rely on.

Book your Skipton LEV thorough examination

Tell us what you run and we will examine, measure, report and label it to HSG258 - across North Yorkshire.