Phoenix Cleaning Company Call 07961 915018
LEV Testing in Walkden

LEV Testing · Walkden

LEV testing in Walkden.

Across Walkden, the engineering, joinery and vehicle workshops throw off fume, mist and dust the law requires to be controlled - and the control proven by a thorough examination and test.

HSG258 examinationMeasured airflow readingsReport & labelFully insured

Where fume and dust control sits in Walkden

The workshops of Walkden are where the engineering and fabrication units weld and machine, the joinery and timber shops cut and sand, and the vehicle and refinishing shops grind and spray. The arc and the grinder raise weld fume and metal dust, and the joinery and spray work add wood dust, oil mist and paint mist, all of which a worker should be kept from breathing.

Local exhaust ventilation catches it at source, and the law will not take that on trust. COSHH requires the weld-fume arms, the wood-dust extraction and the spray and mist extraction to be thoroughly examined and tested at least every 14 months, measured in use rather than assumed to work.

The Walkden workplaces that need an LEV test

01

Precision engineering

CNC and manual machining raises oil mist and metal dust at the enclosure and bench that has to be captured at source.

02

Food and drink production

Flour, powders and steam need capture at the mixing and process points, from bakeries to production kitchens.

03

Woodworking and joinery

Saws, sanders and routers throw fine wood dust that has to be drawn off at the tool and the bench.

04

Welding and fabrication

Weld fume and grinding dust need capture at the arm and booth, wherever steel is fabricated.

05

Vehicle body and paint

Bodyshop spray booths and prep bays carry paint mist and solvent vapour that the extraction has to hold and clear.

06

Laboratory and clinical

Fume cupboards, safety cabinets and dental and salon extraction all count as LEV and all fall due on the same clock.

Typical LEV tests around Walkden

Typical jobs we handle, by sector and area - representative of the work we do, not named clients.

Engineering unit - Towngate Business Centre

A weld-fume and grinding-dust test

At an engineering unit on the Towngate Business Centre in Walkden, welding, grinding and fabricating, the capture at the hoods had fallen off and a haze hung over the benches. We checked capture at the hoods, the ducting and the filters, and found the fan and filters below the duty the process needed. We set out what to put right, re-tested after the work, and certified the system to HSG258.

Joinery workshop - Walkden

A wood-dust extraction test

At a joinery workshop near Walkden, running the saws, planers and sander, the draw at the arms had dropped and the air was thick by mid-shift. We surveyed the system, measured capture and static pressure, and found leakage and an overloaded filter starving the hoods. We reported what needed putting right and re-tested to confirm it held spec, certifying to HSG258.

What a thorough examination and test measures in Walkden

01

Visual and structural

Condition of hoods, ducting, filters and fan - the damage, blockage and wear that quietly drops performance.

02

Quantitative performance

Measured capture and face velocities at the working points, plus transport velocity and static pressure through the system.

03

Benchmark to design

The readings assessed against how the LEV should perform to actually control the exposure - not just whether the fan turns.

04

Air sampling, where needed

Where the process warrants it, sampling to confirm the control is keeping the substance out of the breathing zone.

LEV TESTINGWalkden

Fourteen months, and whose name is on it

The point of a thorough examination and test is to prove the extraction still controls the exposure - so we measure it, we do not eyeball it. Condition, capture and face velocities, transport velocity and static pressure are checked against the design intent under HSG258, and the result is written up and labelled on the plant.

We test to the HSE's guidance, HSG258, and the job ends in a report and a label on the plant: what was measured, what passed, what needs putting right, and the date the next test falls due.

  • The system examined end to end - hood to discharge
  • Capture and face velocities measured at source
  • Transport velocity and static pressure recorded
  • A report, a verdict and a label with the next-due date

Examine, measure, report, label

1

Inspect

We examine the hoods, ducting, filter and fan and identify how each is meant to control its process.

2

Take readings

We record capture and face velocities, transport velocity and static pressure at every key point.

3

Judge

The readings are assessed against the design intent under HSG258, with a clear verdict on control.

4

Label up

The plant is labelled with the result and next-due date, and you get the report for the COSHH file.

Frequently asked questions

How often does LEV have to be tested?

COSHH Regulation 9 sets a maximum of 14 months between tests, and some higher-risk processes need it sooner. We set the interval to match what you run and record the next-due date on the label and the report.

What do we get at the end?

A report of the thorough examination and test to HSG258, each point marked pass or fail with any remedial work set out, and a dated label on the plant with the next-due date.

What if a point fails?

We set out exactly what failed and why - often a single reading such as static pressure or capture velocity - so it can be put right, and we re-test to confirm the control before certifying.

Do you cover Walkden and the wider area?

Yes - the Walkden workshops and units, and across Walkden and the wider Greater Manchester.

Do you only test engineering extraction?

No - any LEV: welding fume arms, wood and grain dust systems, spray booths, mist extraction, fume cupboards, and dental and salon extraction all fall under the same duty and the same clock.

LEV testing in Walkden

In and around Walkden

Walkden works its metal, timber and vehicles, welding and grinding, sawing and sanding, and refinishing - raising weld fume, metal and wood dust, oil mist and paint mist. Every one carries a duty to control what its work throws off - and to prove it with a measured test.

20+ years of experience

We have carried out LEV thorough examination and testing to HSG258 since 2001, across Greater Manchester and the UK. From a machine shop to a joinery, a spray booth or a lab fume cupboard, the job ends the same way: measured readings, a clear verdict, and a label whose next-due date you can rely on.

Book your Walkden LEV thorough examination

Tell us what you run and we will examine, measure, report and label it to HSG258 - across Greater Manchester.